Building Accelerator Methodology: A Catalyst for Timely Construction and Acceptance of Life Sciences Facilities

  • Reference

    998-2095-03-13-14AR0_A4_EN

  • Type

    White paper

  • Languages

    English

  • Date

    13/03/2014

  • Version

    1.1

Download
  • Reference

    998-2095-03-13-14AR0_A4_EN

  • Type

    White paper

  • Languages

    English

  • Date

    13/03/2014

  • Version

    1.1

Description:

Energy and environmental controls are vital in Life Sciences facilities, yet Building Management Systems (BMS) are often the last thing considered in design and construction. This leads to project delays, unnecessary costs, and performance shortcomings. This paper describes a methodology, which integrates BMS best practices into the design and construction process resulting in fewer cost overruns and higher facility performance.

Files for Download

Add to My Documents

Description:

Energy and environmental controls are vital in Life Sciences facilities, yet Building Management Systems (BMS) are often the last thing considered in design and construction. This leads to project delays, unnecessary costs, and performance shortcomings. This paper describes a methodology, which integrates BMS best practices into the design and construction process resulting in fewer cost overruns and higher facility performance.

Files for Download

My Documents

Store, email, and share your favourite documents and products.

View My Documents