• Default Alternative Text

    Demand Response: Load flexibility to optimize performance

  • Energy Pool selected by Elia to mitigate grid contingencies in Belgium

    Energy Pool became the first-ever active aggregator in the Belgian ancillary services market, providing 20 MW of flexible load within a three-minute event-response time.

    Find out more
    Electrical power distribution, electric towers with power lines at sunset.